dev
the builds, plus the side bench
16/38 tasks · 7 levels
- level 1
project 1 · J
8/9- front end enhancement
- backend logic rewrite
- circle bug fixes
- add groups for accounts
- recon can be deleted
- diff currency, diff account
- export to pdf
- Prod With Full Testing
- upload demo version
- level 2
project 2 · G
0/4- stripe connection
- oauth login fix
- box colors
- promo codes
- level 3
project 3 · V
5/12- n8n dummy data
- Stage 7
- Stage 8
- Stage 9
- Other Stages.
- move to vps
- full test
- future features.
- rung-2 ad + funnel pipeline
- survey / panel integration
- pre-order / stripe test
- financial model from real data
- level 4
project 4
2/2- shopify
- stripe details
- level 5
project 5 · Q
0/4- define scope + kill criteria
- build the core
- ship v1
- real life stress testing
- level 6
project 6 · F
1/4- harness + app, built
- decide what it becomes
- find the wedge
- ship public v1
- level 7
side bench
0/3- hynetwork plugin (parked)
- dock ai agent
- android guardian